
New roofs in Hampshire, stripped back and rebuilt right
New roofs in Hampshire for houses, bungalows and blocks of flats. We strip the old roof, fit new membrane, battens and tiles, and give you a written fixed price before we start.
- Free roof inspection with photos of what we find
- Written, fixed quote: the price on it is the price you pay
- We tell you if a repair will do
Book your free roof inspection
What needs sorting? Tap one to start.Or call 07476 927699, 7 daysFree inspection. Written fixed quote. No obligation.When a new roof is the right call
A roof that leaks in three places at once, sags between rafters, or sheds tiles every time the wind picks up has reached the end of its life. Old concrete tiles go soft and porous, clay tiles laminate, and the original felt turns brittle and tears. At that point new battens and membrane under a new covering cost less over ten years than repair after repair.
We only recommend a re-roof when the photos show it. If a repair will do, you hear that first.

How a re-roof runs
- Scaffold up with a debris chute or skip so the garden stays clear
- Old tiles, battens and felt stripped one section at a time
- Rafters checked, with any rotten timber replaced
- Breathable membrane and new treated battens fitted
- Tiles or slates laid and mechanically fixed, with dry fix ridges, hips and verges where they suit the roof
- New lead at chimneys and abutments, ventilation at eaves and ridge
- Gutters cleared, site swept, scaffold down
Tiles and slates to suit the house
Plain clay tiles on a period hip roof, double pantiles on a bay, interlocking concrete tiles on a 1960s semi, natural or fibre cement slate on a Victorian terrace: we match the covering to the house and the street. The plain tile hip roof at the top of this page is one of ours, finished with bonnet hips and two roof windows.

Big roofs and blocks of flats
We re-roof domestic and commercial buildings. One recent job was a large apartment block: the old weathered concrete tiles came off, new membrane and battens went on, and the whole roof was re-tiled with new gutters and outlets along the eaves. You can see it before, during and after on our apartment block case study.
Keeping your house dry during the work
A re-roof is done one section at a time, so the house is never left open to the weather overnight. Membrane goes on the same day the old covering comes off, and if rain is forecast the open area is sheeted. You can stay at home throughout.

Recent roofs we have finished
See all our workPhotos from our own jobs.



What customers say about our work
An honest assessment, even on the outbuilding
Great work by the team, taking good and sympathetic care of an older property. Tom answered all my questions. His explanations gave me confidence in pressing on with the project remotely. A recent honest assessment on an outbuilding has also been very much appreciated.
Fast, professional, recommended to family
Great job carried out by the team super fast and professional will recommend to my family and friends
Professional and tidy
Highly recommend very professional and tidy
Workmanship guaranteed, in writing
Every job we finish comes with our written workmanship guarantee. You also get a written, fixed quote before we start, so nothing about the price or the work is left to a handshake.
We are fully insured and qualified for domestic and commercial roofing. Ask for the certificate with your quote.
How our guarantee worksGood neighbour guarantee
Written workmanship guarantee- In writing: the guarantee comes on paper with your completed job
- Fixed price: the price on your written quote is the price you pay
- Honest advice: if a repair will do, we tell you
- Tidy finish: we clear up and take our waste away
How it works, start to finish
- 1Tell us the problemTap a service or call. We answer 7 days a week.
- 2Free inspectionWe look at the roof and photograph what we find.
- 3Written fixed quoteThe cause, the fix and one price, in writing.
- 4Tidy, guaranteed workDone properly, cleared up, guaranteed in writing.
New roofs: your questions answered
How much does a new roof cost?
It depends on the size, pitch, covering and access. Our new roof cost guide gives typical UK ranges for terraced, semi-detached and detached houses. Your price comes from a free survey and is fixed in writing.
How long does a re-roof take?
Most houses take one to two weeks from scaffold up to scaffold down, longer for large or complex roofs. We give you the expected length when we quote.
Do I need planning permission for a new roof?
Like-for-like re-roofing does not need planning permission on most houses. Listed buildings and conservation areas have extra rules, and we flag those at the survey.
Will you take away all the waste?
Yes. Old tiles, battens and felt go down a chute or into a skip, and the site is swept before we leave.
Ready to get your roof sorted?
Free roof inspection with photos, a written fixed quote and a straight answer on whether a repair will do.
Free inspection. Written fixed quote. No obligation.